Biasi Riva PLUS Condensing Gas Boilers

 

Biasi Riva Plus

 

Biasi Riva PLUS Series Condensing Wall Mounted Boiler

The RIVA Plus Boiler offers a unique condensing technology that increases the efficiency of the RIVA Compact and Combi Boilers to 90% AFUE. With the inclusion of a recuperator, the RIVA Plus can extract the remaining heat from the boiler's exhaust gas and transfer that heat into the return water destined for the boiler's primary heat exchanger. The recuperator guarantees higher efficiency and set-up simplicity. RIVA Plus is the only condensing wall-mounted boiler to offer this technology.

The RIVA Plus Combi version is equipped with a flat plate heat exchanger which heats your domestic water whenever you open the hot water taps. The high efficiency design eliminates all the standby losses associated with storage tank water heaters.

Both RIVA Plus Combi and Compact Boilers maintain a constant high efficiency in both high and low temperature heating systems. Utilizing Biasi's Concept panel radiators, which heat at low water temperatures, will further increase efficiency by decreasing the average temperature of your heating system.

**  Can be PVC Vented! See Technical Resources on Bottom Left for Details **

Technical Advantages

  • Stainless steel recuperator
  • ASME certified heat exchanger rated at 43.5 PSI
  • CSA certified
  • 90% AFUE Condensing Gas Boiler
  • Natural gas or propane compatible
  • Gas valve modulation
  • Output Modulates 41,600 BTU to 103,000 BTU
  • Self contained: all parts internalized
  • Electronic spark ignition
  • Versatile venting options: separate or concentric systems available
  • Wall-Mounted

Safety Features

  • Frost protection system
  • Self diagnostic control system
  • Safety fl ow switch to prevent thermal shock in the event of low/no water in the heating system
  • Internal high limit temperature control
  • Blocked flue pressure switch
  • Circulator protection if the boiler is idle for 24 hours
  • Condensate trap with safety lock out

Warranty

  • 2 years complete
  • 10 years on the primary heat exchanger
Riva Plus Inside View
Model
Gas In.
(BTU/HR)
Min. Out.
(BTU/HR)
Heating Capacity
(BTU/HR)
AFUE
DHW Output
(gph)
Width
inches
Height
inches
Depth
inches
Weight
lbs
Riva Plus Compact
116,000
41,600
103,000
90%
N.A.
15.8
31.6
13.8
96
Riva Plus Combi
116,000
41,600
103,000
90%
2.75 @ 70° rise
15.8
31.6
13.8
110

 

Contact Us for a Free Estimate from a Local Dealer

 

Biasi logo

Biasi Riva PLUS Modulating Gas Boilers

Part of Eco-Friendly Campus Retrofits

Guelph Campus Co-operative.
By Students. For Students. Since 1913

 When the Guelph Campus Co-op was looking to update the central heating systems in several of their 8 unit apartment buildings, they were looking to do so, while fulfilling their mandate.

“Affordable and close to campus, the Co-op operates lodging houses and apartment buildings below conventional market rates.  It's more affordable because our mandate is to serve students, not make big profits. The Co-op has a mandate to pursue environmental efficiencies wherever possible. This is being demonstrated through retrofits... and procurement of energy saving appliances.”   

Excerpt taken from www.guelphcampus.coop

                                                                     

Located on a lovely spot near the river and trails, Guelph Campus Co-operative owns and manages five identical 8 unit apartment buildings that are 45 years old. They are now heated with BIASI.

Jeff Bousfield, Maintenance Supervisor for Guelph Campus Co-operative, standing beside two newly installed BIASI Riva Plus modulating condensing gas boilers.

BIASI Riva Plus Boilers.
Efficient, Reliable and Affordable.

                                                                                
There were a number of factors that influenced the decision to replace the older boiler in each building with two, modern units:

  • Install high quality equipment at an affordable cost.
  • Improve system efficiency to reduce on-going heating expenses.  
  • Replace older equipment, which would become more costly to maintain in the future.  
  • Find modulating condensing gas boilers that could perform at highest efficiencies when matched with the existing high temperature radiation system in the building.
  • Create the ability for system staging.
  • The ability to direct vent the units.

The Two Riva Plus boilers were vented using factory provided powder-coated steel piping.  *Note the Riva Plus can also be vented using CPVC.

 

The Tekmar 262 allows for staging of the two boilers and indirect hot water heater in the system, providing a large amount of data that is very helpful and understandable.   

A separate part of the efficiency project was the addition of solar hot water heaters pictured here. The solar collection panels can be seen on roof of the building pictured above

Installing Contractor for Boiler System: Arthurs Fuels.

For a downloadable, full colour PDF of this case study Click Here.